Skip to content
HomeCalcify

How to Lay A Gravel Driveway

Learn how to lay a gravel driveway step by step, with the tools, materials, and a free calculator to estimate exactly what you need. To find how much gravel you need, multiply length × width × depth (in feet) for cubic feet, divide by 27 for cubic yards, then multiply by about 1.4 for tons. A 40×10 ft driveway at 4 inches deep needs about 4.9 cubic yards (≈ 6.9 tons), costing roughly $210–$415 delivered.

Get exact numbers

Use the free Gravel Calculator to estimate your project.

Open calculator

Tools

  • Tape measure
  • Wheelbarrow
  • Rake
  • Plate compactor
  • Landscape fabric

Materials

  • Crushed stone base (#3)
  • Top gravel (#57 or crusher run)
  • Geotextile fabric
  • Edging

Step-by-step

  1. 1

    Measure the area

    Record length and width in feet.

  2. 2

    Choose a depth

    4 in for footpaths, 6–8 in for a gravel driveway over a base.

  3. 3

    Find the volume

    Multiply area × depth, divide by 27 for cubic yards.

  4. 4

    Convert to tons

    Multiply cubic yards by about 1.4 for delivery weight.

Pro tips

  • Avoid: skipping the base layer — A gravel driveway needs a coarse base (#3) under the top layer (#57). Skipping it leads to ruts and sinking.
  • Avoid: going too shallow — Driveways need 6–8 inches total over a stable base. Less than that won't hold up to vehicle weight.
  • Avoid: forgetting fabric — Landscape fabric under the gravel stops it mixing into the soil and reduces weeds.
  • Avoid: not compacting — Compact each layer with a plate compactor — loose gravel migrates and washes away.

Frequently asked questions

Explore this topic